BC ferries

VEAS, Asker (Norway)

 

The new facility will comprise a biogas upgrading and liquefaction plant. It will enable VEAS to produce biogas creating an alternative to fossil fuels and reducing CO2 emissions.

The new bioLNG plant will be incorporated together with the company’s existing biogas plant. The total bioLNG production capacity will be 20 tons per day.

The scope of supply for the bioLNG plant includes upgrading of the biogas, hot water production, liquefaction, storage and truck loading capability.

Wärtsilä is delivering the system on a fast-track basis, and the on-site installation is scheduled to be completed within a 14-month time-frame. The plant is expected to become in commercial operation during 2020.

 

Contact us

Please fill in the form, we aim to respond within 1-2 business days depending on the enquiry. For an existing installation, provide all necessary details to identify the installation and the equipment. Fields indicated with an asterisk (*) are required. 

Find your local Wärtsilä office here

For SPARE PARTS, please e-mail us with the equipment serial number or the name of the installation at spares.wgs@wartsila.com


For TECHNICAL SUPPORT & SERVICE, please email us with the equipment serial number or the name of the installation at services.wgs@wartsila.com.

Equipment serial number is taken from the equipment nameplate and includes all letters and numbers as given on the equipment nameplate.

? 2020 W?rtsil?
免费可以看污片的软件/在线播放免费人成动漫视频/免费可以看黄的视频/猪泡泡影院